HUAWEI BTS 3606 PDF

All the outdoor units including BTSAC and RRU comply with either With Huawei latest CDMA BTS products, based upon the physical. Widely deployed in Reliance’s network, Huawei’s BTS AC-R is designed to handle high temperatures and power failures in India. Find solutions to your huawei bts question. Get free help, tips & support from top experts on huawei bts related issues.

Author: Malagul Goltishura
Country: Dominica
Language: English (Spanish)
Genre: Travel
Published (Last): 16 June 2006
Pages: 375
PDF File Size: 4.57 Mb
ePub File Size: 15.58 Mb
ISBN: 859-6-79947-397-6
Downloads: 61245
Price: Free* [*Free Regsitration Required]
Uploader: Shakajora

The alarm box is correctly installed according to the design.

Munir has 2 jobs listed on their profile. Sell Huawei S ethernet switches layer Chapter 1 Installation Preparations introduces how to arrange the personnel arrangement, check the installation environment check, prepare project plan and make kickoff coordination, and conduct the guawei check.

Installing the Lower Support To install the lower support, proceed as follows: When installing hhawei RF cable, connect unused connectors to matching load and secure them. Paint the whole support with rustproof coat and top-coat.

Page 14 – Power Supply Conditions of the Equipment Connect one end of huwaei cable to the working ground of the EAC. We used 2 types of BTS: Pyae Min has 3 jobs listed on their profile. Other products from this supplier. Figure shows RF cable connections, indicated by blue lines. Lead the cables into their corresponding cable-fixing troughs. The cabinet is placed upside down.

  GRETA KRIPPNER PDF

Huawei BTS Baseband Subsystem

Low prices of Cdma Unlock Lock and other comparable listings. That is, 1 m 39 in. To remove cabinet doors, do it in a reverse order. To locate the support at the side of antistatic floor, proceed as follows: Each RRU supports two carriers. Uzual cand nu e aglomeratie un speedtest imi arata Mbps. Place the support below the antistatic floor. Fix them onto the units. Connect the two probes to the paint-free place of the base and the expansion bolt. When positioning the cabinet, try to avoid the interference between the installation supports and the antistatic floor framework.

GND cables for indoor cabling racks and for outdoor cabling racks. Lihat profil lengkap di LinkedIn dan terokai kenalan dan pekerjaan Muhammad Waleed di syarikat yang serupa. Figure Installing a cabinet on the floor without sufficient bearing capacity Mohamed El Amine has 1 job listed on their profile. Clamp the cables to the bracket. If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause.

Got it, continue to print. Joseph has 4 jobs listed on their profile. Mustapha tem 4 empregos no perfil. Sell Huawei S enterprise network switches Tighten the bolts on the cover.

Procedure To carry out the power-on check of power module, proceed as follows: Means a complementary description. Huasuda Place of Origin: Page 70 – Distributing Protection Grounding Cables Remove the antennas of the terminals.

  LEPTADENIA PYROTECHNICA PDF

Ve el perfil completo en LinkedIn y descubre los contactos y empleos de Mustapha en empresas similares. Some terminals of vendor Z, however, automatically power off. A wide variety of cdma base station options are available to you, such as paid samples, free samples.

Huawei BTS DBS BBU3900 LTE GSM TDSCDMA WCDMA CDMA2000 Base Station BBU RRU LBBP UBBP WBBP UPEU

Free Member Registration Date: The letters A, B, C as shown in Figure are not cable labels. Mkhululi has 4 jobs listed on their profile. The antistatic floor height refers to the distance between the upper surface of the antistatic floor and the cement floor.

About Contact Storefront Sitemap. You may also be intersted in access control ac ap Baber has 7 jobs listed on their profile. Connect the other huawi to the DB9 socket of the power backplane. Remove four bolts and one gasket that connect the antistatic floor and the support. Usando la base del Gabinete Metodo 2: Site creation, software down load and expansion Swap Activity. Leveling the lower support See section 2.